ASCA Sequence 84042000 Header Page
This page gives a basic description of this sequence
and references to more detailed information.
The following information is also available:
Observation Information
- Object: P2 (SC REGION)
- Nominal Pointing (degrees)
- R.A.=202.915 Dec.=-31.473
- Lii=312.897 Bii=30.619
- Observation Date: July 27, 1996
- Duration: 108.6 kiloseconds
- Approximate SIS Exposure:
46 kiloseconds
(approximately 10% with telemetry saturated)
- Approximate GIS Exposure:
51.6 kiloseconds
Processing Information
- Sequence Version: 005
- Processing Version: 7.2.3
(Revision 2)
- FTOOLS Version: 4.0.c
- Processing Date: May 21, 1998
- GIS Secular Gain Calibration Date: March 15, 1998
- GIS Gain Map Calibration Date: September 30, 1997
- SIS CTI Calibration Date: October 3, 1997
US Principal Investigator
NONE
Japan Principal Investigator
DR. TAKESHI GO TSURU
PHYSICS
KYOTO
KITASHIRAKAWA-OIWAKE, SAKYO-KU
KYOTO, KYOTO 606-01
JAPAN
TSURU@CR.SCPHYS.KYOTO-U.AC.JP