ASCA Sequence 27006010 Header Page
This page gives a basic description of this sequence
and references to more detailed information.
The following information is also available:
Observation Information
- Object: 1E1841-0045
- Nominal Pointing (degrees)
- R.A.=280.383 Dec.=-4.865
- Lii=27.473 Bii=-0.02
- Observation Date: March 29, 1999
- Duration: 50.3 kiloseconds
(with 3 kiloseconds of telemetry gaps)
- Approximate SIS Exposure:
21.6 kiloseconds
(approximately 8% with telemetry saturated)
- Approximate GIS Exposure:
23.8 kiloseconds
Processing Information
- Sequence Version: 002
- Processing Version: 7.3.7
(Revision 2)
- FTOOLS Version: 4.2.b
- Processing Date: November 18, 1999
- GIS Secular Gain Calibration Date: August 8, 1999
- GIS Gain Map Calibration Date: April 1, 1999
- SIS CTI Calibration Date: October 3, 1997
US Principal Investigator
NONE
Japan Principal Investigator
MR. YOSHITAKA SAITO
INSTITUTE OF SPACE AND ASTRONAUTICAL SCIENCE
3-1-1, YOSHINODAI
SAGAMIHARA, KANAGAWA, 229-8510
JAPAN
SAITO@BALLOON.ISAS.AC.JP