Sequence 27006030 Header Page
This page gives a basic description of this sequence
and references to more detailed information.
The following information is also available:
Observation Information
- Object: 1E1841-0045
- Nominal Pointing (degrees)
- R.A.= 280.384
Dec.= -4.867
- Lii= 27.473
Bii= -0.022
- Observation Date: April 13, 1999
- Duration: 56.7 kiloseconds (with 0 kiloseconds of telemetry gaps)
- Approximate SIS Exposure: 19.9 kiloseconds (approximately 19% with telemetry saturated
- Approximate GIS Exposure: 21.2 kiloseconds
Processing Information
- Sequence Version: 004
- Processing Version: 8.0.3 (Revision 2)
- FTOOLS Version: 5.0.c
- Processing Date: July 17, 2000
- GIS Secular Gain Calibration Date February 4, 2000
- GIS Gain Map Calibration Date: October 1, 1999
- SIS CTI Calibration Date: October 3, 1997
US Principal Investigator
NONE
Japanese Principal Investigator
MR. YOSHITAKA SAITO
INSTITUTE OF SPACE AND ASTRONAUTICAL SCIENCE
3-1-1, YOSHINODAI
SAGAMIHARA, KANAGAWA, 229-8510
JAPAN
SAITO@BALLOON.ISAS.AC.JP