ASCA Sequence 91002000 Header Page
This page gives a basic description of this sequence
and references to more detailed information.
The following information is also available:
Observation Information
- Object: POINT A.
- Nominal Pointing (degrees)
- R.A.=197.981 Dec.=30.323
- Lii=69.569 Bii=84.489
- Observation Date: December 26, 1993
- Duration: 26.8 kiloseconds
- Approximate SIS Exposure:
10.8 kiloseconds
(approximately 2% with telemetry saturated)
- Approximate GIS Exposure:
11.2 kiloseconds
Processing Information
- Sequence Version: 003
- Processing Version: 7.2.3
(Revision 2)
- FTOOLS Version: 4.0.c
- Processing Date: April 30, 1998
- GIS Secular Gain Calibration Date: January 14, 1998
- GIS Gain Map Calibration Date: September 30, 1997
- SIS CTI Calibration Date: October 3, 1997
US Principal Investigator
NONE
Japan Principal Investigator
DR. TAKESHI GO TSURU
PHYSICS
KYOTO
KITASHIRAKAWA-OIWAKE, SAKYO-KU
KYOTO, KYOTO 606-01
JAPAN
TSURU@CR.SCPHYS.KYOTO-U.AC.JP