| VS03p Results
Submitted checklist.txt and checklist.tex is also available |
[Summary | AIPS | Difmap ] |
| Abstract
This is a 2 GRTs VSOP survey experiment. Fringes were clearly detected on all three (1 ground-ground and 2 ground-space) baselines. Since only 3 antennas (including Halca) available, imaging was done without any amplitude self-cal. Model fitting was tried to fit the central region only with a circular Gaussian component while keeping 24 clean components of remaining structure. For both calibrators 0528+134 and 0808+019, strong fringes were seen on the ground baseline (HartRAO - Noto) of 6,000km with correlated flux densities of 0.95Jy and 0.40Jy, respectively. The data after 21:24:01 was useless because both u and v were wrongly set zero for ground baseline. Fringes still can be seen for both J0607-08 and 0808+019. The reason is unknown. |
AIPS Input Files
| ANTAB.TXT | Comments - None - |
AIPS Output Files
| Phase selfcal applied? | No |
| Global amplitude selfcal (gscal) applied? | No |
| Amplitude selfcal on non-global timescales used? | No |
| Modelfit made and saved? | Yes |
| Image Made and saved? | Yes |
| Comments on Difmap processing
|
| Image | ||||
| Ampl, Phase vs (u,v) Distance PS (21 kb) GIF (5 kb) |
Ampl, Phase vs Time PS (65 kb) GIF 1, 2 |
(u,v) Coverage PS (11 kb) GIF (4 kb) | Closure Phase vs Time PS (42 kb) GIF 1 |
Clean Image PS (32 kb) GIF (89 kb) |
| Modelfit | ||||
| Ampl, Phase vs (u,v) Distance PS (21 kb) GIF (5 kb) |
Ampl, Phase vs Time PS (65 kb) GIF 1, 2 |
(u,v) Coverage PS (11 kb) GIF (4 kb) | Closure Phase vs Time PS (42 kb) GIF 1 |
Image with model components PS (33 kb) GIF (7 kb) |
More details on the Images and Modelfits are found in this page.