cje2c3l Version 1.22b Jan. 28 1998 22:58 PST ============================== cje2c3l VS03k Build Summary ============================== Job Start Epoch: 1998-096-15:00:00 Job Stop Epoch: 1998-096-23:18:08 Duration of job: 8.3 hours Tape change epochs: 1 Stations: 'VSOP_SC' (srt) 'HOBART' (grt) 'SESHAN25' (grt) 'MOP' (grt) Tracking Stations: 'GOLDS_TS' 'TDBIN_TS' Tracking PASSES: 'GOLDS_TS' 1998-096-16:16:10 --> 1998-096-20:00:37 'TDBIN_TS' 1998-096-21:00:00 --> 1998-096-23:03:08 Sources: 'J1743-03' '1730-130' Tape ids: 'CA-3-006530F' 'ATNF0346' 'ATNF0384' 'CA-3-004350D' 'CA-3-0057411' 'AT-3-003501A' Totals: [17] PB_STARTs [17] PB_STOPS [6] Tape ids [3] PCFS logs [1] SRT logs This job was built by ________________ on Tue Apr 21 10:31:34 1998 Number of baselines at build time: 6 ACTUAL: ____________ Total number of lags at build time: 6144 ACTUAL: ____________ Duration of job at build time: 8.3 HRS ACTUAL: _____________ Checked and ready for correlation. Date: _________________ Person: ________________ =========================== CHECKLIST for job 'VS03k' =========================== Complete this checklist before running 'makeVS03k'. [ ] Copy the experiment VS03k.sum file and any additional note files to the job's working directory. If ATNF telescopes are involved, note files in the form of .notes must be downloaded from the ATNF server 'ftp.atnf.csiro.au' in the directory '/pub/people/vlbi/vsop/logs/'. These note files contain information ***CRITICAL*** to the correlation of ATNF telescopes. [ ] Check VS03k.jb for correct parameters (sample rate etc.) Check default integration time. [ ] Ensure that TCF file(s) (*.kcX) for tracking station 'GOLDS_TS' are in the job directory for time ranges (yymmddhhmm): 9804061616 to 9804062000. X - d==Goldstone; m==Madrid; t==Tidbinbilla; g==Greenbank; u==Usuda [ ] Ensure that TCF file(s) (*.kcX) for tracking station 'TDBIN_TS' are in the job directory for time ranges (yymmddhhmm): 9804062100 to 9804062303. X - d==Goldstone; m==Madrid; t==Tidbinbilla; g==Greenbank; u==Usuda [ ] Add reconstr-orbit binary spk file(s) (.bsp) to VS03k.egb -- look for ??? Ensure these .bsp files are in the job directory and cover required tracking pass time ranges. [ ] Check VSOP_SC.st for correct parameters...modify if necessary. VSOP_SC.ev files contain events for ALL channels...modification required if pulsar gating is used. Check pt_type and set Synthetic Autocorrelator parms for best result. [ ] NOTE: If VSOP_SC logs do not contain flag data, these must be extracted from 'models.out' after make'ing the job and put in the VSOP_SC.ev file in the proper format. Look for 'linear connection'. [ ] Add TCF FITS file references (*.kcX) to VSOP_SC_l.smb -- look for ?? X - d==Goldstone; m==Madrid; t==Tidbinbilla; g==Greenbank; u==Usuda IF TCF FILES ARE NOT AVAILABLE then the downlink delay must be added. [ ] Add CALIBRATION and ANTENNA coefficients to VSOP_SC.cal -- if required. [ ] Check HOBART.st for correct parameters...modify if necessary. HOBART.ev files contain events for ALL channels...modification required if pulsar gating is used. Comment .ev file reference if not required. Check pt_type and set Synthetic Autocorrelator parms for best result. [ ] Add GPS clock offset model to station clock model file HOBART_c.smb. If station time is faster/leading GPS time then it is a (+)'ve delay. [ ] Add constant station delay to station clock model file HOBART_c.smb. This must always be >= 0.0. [ ] Add CALIBRATION and ANTENNA coefficients to HOBART.cal -- if required. [ ] Check SESHAN25.st for correct parameters...modify if necessary. SESHAN25.ev files contain events for ALL channels...modification required if pulsar gating is used. Comment .ev file reference if not required. Check pt_type and set Synthetic Autocorrelator parms for best result. [ ] Add GPS clock offset model to station clock model file SESHAN25_c.smb. If station time is faster/leading GPS time then it is a (+)'ve delay. [ ] Add constant station delay to station clock model file SESHAN25_c.smb. This must always be >= 0.0. [ ] Add CALIBRATION and ANTENNA coefficients to SESHAN25.cal -- if required. [ ] Check MOP.st for correct parameters...modify if necessary. MOP.ev files contain events for ALL channels...modification required if pulsar gating is used. Comment .ev file reference if not required. Check pt_type and set Synthetic Autocorrelator parms for best result. [ ] Add GPS clock offset model to station clock model file MOP_c.smb. If station time is faster/leading GPS time then it is a (+)'ve delay. [ ] Add constant station delay to station clock model file MOP_c.smb. This must always be >= 0.0. [ ] Add CALIBRATION and ANTENNA coefficients to MOP.cal -- if required. [ ] Check VS03k.bs for correct baselines...remove comments if baseline module autocorrelation is required. Check baseline integration times. [ ] Ensure that SOURCE 'J1743-03' is in ~/smdb/finblokq.dat or in finlocq.dat Ensure source coordinates are IDENTICAL to that in the VS03k.sum file. [ ] Ensure that SOURCE '1730-130' is in ~/smdb/finblokq.dat or in finlocq.dat Ensure source coordinates are IDENTICAL to that in the VS03k.sum file. [ ] Update file J1743-03.cal -- if necessary for cc2fits (source coordinates are automatically extracted from the VS03k.eg file). [ ] Update file 1730-130.cal -- if necessary for cc2fits (source coordinates are automatically extracted from the VS03k.eg file). [ ] Check to ensure that ~/smdb/finals.data is up-to-date for this obs. [ ] When all above checks are complete and all auxillary TCF and bsp files are installed, run 'makeVS03k'. [ ] Check 'models.out' for any model generation ERRORs or WARNINGs [ ] 'makeVS03k' ran ok? [ ] Run 'cc2fits' until BSD file catalogging starts -- to ensure job is FITS exportable. [ ] Create job VS03k directory on geo (e.g. geod1/VS03k), copy 'cc2fits.control' and edit it in preparation for FITS export and raw data archive. [ ] Job 'VS03k' is ready for correlation. --------------------- JOB 'VS03k' PLAYBACK SCHEDULE ------------------ VSO HOB SES MOP 096-15:00+00 - - - - +05 - - - - +10 - - - - +15 - - - - +20 - - - - +25 - - - - +30 - - - - +35 - - - - +40 - - - - +45 - - - - +50 - - - - +55 - - T** T** 096-16:00+00 - - P P +05 - P P P +10 - P P P +15 T** P P P +20 P P P P +25 P P P P +30 P P P P +35 P P P P +40 P P P P +45 P P P P +50 P P P P +55 P P P P 096-17:00+00 P P P P +05 P P P P +10 P P P P +15 P P P P +20 P P P P +25 P P P P +30 P P P P +35 P P P P +40 P P P P +45 P P P P +50 P P P P +55 P P P P 096-18:00+00 P P P P +05 P P P P +10 P P P P +15 P P P P +20 P P P P +25 P P P P +30 P P P P +35 P P P P +40 P P P P +45 P P P P +50 P P P P +55 P P P P 096-19:00+00 P P P P +05 P P P P +10 P P P P --------------------- JOB 'VS03k' PLAYBACK SCHEDULE ------------------ VSO HOB SES MOP +15 P P P P +20 P P P P +25 P P P P +30 P P P P +35 P P P P +40 P P P P +45 P P P P +50 P P P P +55 P P P P 096-20:00+00 - P P P +05 - P P P +10 - P P P +15 - P P P +20 - P P P +25 - P P P +30 - - - - +35 - - - - +40 - T** - - +45 - P - - +50 - - - - +55 - - - - 096-21:00+00 - - - - +05 - - - - +10 - - - - +15 - - - - +20 - - - - +25 - - - - +30 - P P P +35 - P P P +40 - P P P +45 - P P P +50 - P P P +55 T** P P P 096-22:00+00 P P P P +05 P P P P +10 P P P P +15 P P P P +20 P P P P +25 P P P P +30 P P P P +35 P P P P +40 P P P P +45 P P - P +50 P P - P +55 P P - P 096-23:00+00 - - - - +05 - - - - +10 - - - - +15 - - - - ================== EXPERIMENT 'VS03k' SUMMARY REPORT ================== **** TO BE FILLED IN BY THE PR AND GIVEN TO THE OPERATIONS MANAGER **** DATE: _________________ PR: ____________ [ ] RELEASED [ ] ABANDONED Reason: ================================ STATION FRINGE DETECTION SUMMARY ================================ VSOP_SC fringes detected _______% of the time. Comments: HOBART fringes detected _______% of the time. Comments: SESHAN25 fringes detected _______% of the time. Comments: MOP fringes detected _______% of the time. Comments: ==================================== TRACKING STATION PERFORMANCE SUMMARY ==================================== 'GOLDS_TS' 1998-096-16:16:10 --> 1998-096-20:00:37 % fringes: _______ ~Res. del: _______ ~Res. drate: _______ 'TDBIN_TS' 1998-096-21:00:00 --> 1998-096-23:03:08 % fringes: _______ ~Res. del: _______ ~Res. drate: _______ ==================== DATA RELEASE SUMMARY ==================== Release date: _____________________________ Data volume: ________ FITS files; _______ Gbytes Exabyte/DAT Shipments (TO/FORMAT/CARRIER): Comments: