cje2c3l Version 1.22c Jun. 25 1998 10:49 PDT ============================== cje2c3l VS06e Build Summary ============================== Job Start Epoch: 1998-212-18:00:00 Job Stop Epoch: 1998-212-22:45:06 Duration of job: 4.8 hours Tape change epochs: 0 Stations: 'NRAO_140' (grt) 'HARTRAO' (grt) 'VSOP_SC' (srt) Tracking Stations: 'MADRD_TS' 'USUDA_TS' Tracking PASSES: 'MADRD_TS' 1998-212-19:25:50 --> 1998-212-20:34:52 'USUDA_TS' 1998-212-20:41:43 --> 1998-212-21:50:08 Sources: '1611+343' 'J1549+02' Tape ids: 'CA-3-000810A' 'CA-3-0075411' 'CA-3-0080912' 'CA-3-0076412' Totals: [7] PB_STARTs [7] PB_STOPS [4] Tape ids [2] PCFS logs [1] SRT logs This job was built by ________________ on Wed Sep 9 13:29:47 1998 Number of baselines at build time: 3 ACTUAL: ____________ Total number of lags at build time: 3072 ACTUAL: ____________ Duration of job at build time: 4.8 HRS ACTUAL: _____________ Checked and ready for correlation. Date: _________________ Person: ________________ =========================== CHECKLIST for job 'VS06e' =========================== Complete this checklist before running 'makeVS06e'. [ ] Copy the experiment VS06e.sum file and any additional note files to the job's working directory. If ATNF telescopes are involved, note files in the form of .notes must be downloaded from the ATNF server 'ftp.atnf.csiro.au' in the directory '/pub/people/vlbi/vsop/logs/'. These note files contain information ***CRITICAL*** to the correlation of ATNF telescopes. [ ] Check VS06e.jb for correct parameters (sample rate etc.) Check default integration time. [ ] Ensure that TCF file(s) (*.kcX) for tracking station 'MADRD_TS' are in the job directory for time ranges (yymmddhhmm): 9807311925 to 9807312034. X - d==Goldstone; m==Madrid; t==Tidbinbilla; g==Greenbank; u==Usuda [ ] Ensure that TCF file(s) (*.kcX) for tracking station 'USUDA_TS' are in the job directory for time ranges (yymmddhhmm): 9807312041 to 9807312150. X - d==Goldstone; m==Madrid; t==Tidbinbilla; g==Greenbank; u==Usuda [ ] Add reconstr-orbit binary spk file(s) (.bsp) to VS06e.egb -- look for ??? Ensure these .bsp files are in the job directory and cover required tracking pass time ranges. [ ] Check NRAO_140.st for correct parameters...modify if necessary. NRAO_140.ev files contain events for ALL channels...modification required if pulsar gating is used. Comment .ev file reference if not required. Check pt_type and set Synthetic Autocorrelator parms for best result. [ ] Add constant station delay to station clock model file NRAO_140_c.smb. This must always be >= 0.0. [ ] Add CALIBRATION and ANTENNA coefficients to NRAO_140.cal -- if required. [ ] Check HARTRAO.st for correct parameters...modify if necessary. HARTRAO.ev files contain events for ALL channels...modification required if pulsar gating is used. Comment .ev file reference if not required. Check pt_type and set Synthetic Autocorrelator parms for best result. [ ] Add constant station delay to station clock model file HARTRAO_c.smb. This must always be >= 0.0. [ ] Add CALIBRATION and ANTENNA coefficients to HARTRAO.cal -- if required. [ ] Check VSOP_SC.st for correct parameters...modify if necessary. VSOP_SC.ev files contain events for ALL channels...modification required if pulsar gating is used. Check pt_type and set Synthetic Autocorrelator parms for best result. [ ] NOTE: If VSOP_SC logs do not contain flag data, these must be extracted from 'models.out' after make'ing the job and put in the VSOP_SC.ev file in the proper format. Look for 'linear connection'. [ ] Add TCF FITS file references (*.kcX) to VSOP_SC_l.smb -- look for ?? X - d==Goldstone; m==Madrid; t==Tidbinbilla; g==Greenbank; u==Usuda IF TCF FILES ARE NOT AVAILABLE then the downlink delay must be added. [ ] Add CALIBRATION and ANTENNA coefficients to VSOP_SC.cal -- if required. [ ] Check VS06e.bs for correct baselines...remove comments if baseline module autocorrelation is required. Check baseline integration times. [ ] Ensure that SOURCE '1611+343' is in ~/smdb/finblokq.dat or in finlocq.dat Ensure source coordinates are IDENTICAL to that in the VS06e.sum file. [ ] Ensure that SOURCE 'J1549+02' is in ~/smdb/finblokq.dat or in finlocq.dat Ensure source coordinates are IDENTICAL to that in the VS06e.sum file. [ ] Update file 1611+343.cal -- if necessary for cc2fits (source coordinates are automatically extracted from the VS06e.eg file). [ ] Update file J1549+02.cal -- if necessary for cc2fits (source coordinates are automatically extracted from the VS06e.eg file). [ ] Check to ensure that ~/smdb/finals.data is up-to-date for this obs. [ ] When all above checks are complete and all auxillary TCF and bsp files are installed, run 'makeVS06e'. [ ] Check 'models.out' for any model generation ERRORs or WARNINGs [ ] 'makeVS06e' ran ok? [ ] Run 'cc2fits' until BSD file catalogging starts -- to ensure job is FITS exportable. [ ] Create job VS06e directory on geo (e.g. geod1/VS06e), copy 'cc2fits.control' and edit it in preparation for FITS export and raw data archive. [ ] Job 'VS06e' is ready for correlation. --------------------- JOB 'VS06e' PLAYBACK SCHEDULE ------------------ NRA HAR VSO 212-18:00+00 - - - +05 - - - +10 - - - +15 - - - +20 - - - +25 - - - +30 - - - +35 - - - +40 - - - +45 - - - +50 - - - +55 - - - 212-19:00+00 - T** - +05 - P - +10 - P - +15 T** P - +20 P P - +25 P P T** +30 P P P +35 P P P +40 P P P +45 P P P +50 P P P +55 P P P 212-20:00+00 P P P +05 P P P +10 P P P +15 P P P +20 P P P +25 P P P +30 P P - +35 P P - +40 P P T** +45 P P P +50 P P P +55 P P P 212-21:00+00 P P P +05 P P P +10 P P P +15 P P P +20 P P P +25 P P P +30 P P P +35 P P P +40 P P P +45 P P P +50 P P - +55 P P - 212-22:00+00 P P - +05 P P - +10 P P - --------------------- JOB 'VS06e' PLAYBACK SCHEDULE ------------------ NRA HAR VSO +15 P P - +20 P P - +25 P P - +30 - - - +35 - - - +40 - - - +45 - - - ================== EXPERIMENT 'VS06e' SUMMARY REPORT ================== **** TO BE FILLED IN BY THE PR AND GIVEN TO THE OPERATIONS MANAGER **** DATE: _________________ PR: ____________ [ ] RELEASED [ ] ABANDONED Reason: ================================ STATION FRINGE DETECTION SUMMARY ================================ NRAO_140 fringes detected _______% of the time. Comments: HARTRAO fringes detected _______% of the time. Comments: VSOP_SC fringes detected _______% of the time. Comments: ==================================== TRACKING STATION PERFORMANCE SUMMARY ==================================== 'MADRD_TS' 1998-212-19:25:50 --> 1998-212-20:34:52 % fringes: _______ ~Res. del: _______ ~Res. drate: _______ 'USUDA_TS' 1998-212-20:41:43 --> 1998-212-21:50:08 % fringes: _______ ~Res. del: _______ ~Res. drate: _______ ==================== DATA RELEASE SUMMARY ==================== Release date: _____________________________ Data volume: ________ FITS files; _______ Gbytes Exabyte/DAT Shipments (TO/FORMAT/CARRIER): Comments: