cje2c3l Version 1.22c Jun. 25 1998 10:49 PDT ============================== cje2c3l VS06z Build Summary ============================== Job Start Epoch: 1998-319-21:00:00 Job Stop Epoch: 1998-320-02:23:00 Duration of job: 5.4 hours Tape change epochs: 0 Stations: 'ARECIBO' (grt) 'NRAO_140' (grt) 'HARTRAO' (grt) 'NOTO' (grt) Sources: 'J0149+05' '2251+158' '0119+115' Tape ids: 'CA-3-0059413' 'CA-3-0085816' 'CA-3-0012206' 'CA-3-0001002-0' Totals: [16] PB_STARTs [16] PB_STOPS [4] Tape ids [3] PCFS logs [0] SRT logs This job was built by ________________ on Mon Dec 7 15:08:05 1998 Number of baselines at build time: 6 ACTUAL: ____________ Total number of lags at build time: 6144 ACTUAL: ____________ Duration of job at build time: 5.4 HRS ACTUAL: _____________ Checked and ready for correlation. Date: _________________ Person: ________________ =========================== CHECKLIST for job 'VS06z' =========================== Complete this checklist before running 'makeVS06z'. [ ] Copy the experiment VS06z.sum file and any additional note files to the job's working directory. If ATNF telescopes are involved, note files in the form of .notes must be downloaded from the ATNF server 'ftp.atnf.csiro.au' in the directory '/pub/people/vlbi/vsop/logs/'. These note files contain information ***CRITICAL*** to the correlation of ATNF telescopes. [ ] Check VS06z.jb for correct parameters (sample rate etc.) Check default integration time. [ ] Check ARECIBO.st for correct parameters...modify if necessary. ARECIBO.ev files contain events for ALL channels...modification required if pulsar gating is used. Comment .ev file reference if not required. Check pt_type and set Synthetic Autocorrelator parms for best result. [ ] Add GPS clock offset model to station clock model file ARECIBO_c.smb. If station time is faster/leading GPS time then it is a (+)'ve delay. [ ] Add constant station delay to station clock model file ARECIBO_c.smb. This must always be >= 0.0. [ ] Add CALIBRATION and ANTENNA coefficients to ARECIBO.cal -- if required. [ ] Check NRAO_140.st for correct parameters...modify if necessary. NRAO_140.ev files contain events for ALL channels...modification required if pulsar gating is used. Comment .ev file reference if not required. Check pt_type and set Synthetic Autocorrelator parms for best result. [ ] Add constant station delay to station clock model file NRAO_140_c.smb. This must always be >= 0.0. [ ] Add CALIBRATION and ANTENNA coefficients to NRAO_140.cal -- if required. [ ] Check HARTRAO.st for correct parameters...modify if necessary. HARTRAO.ev files contain events for ALL channels...modification required if pulsar gating is used. Comment .ev file reference if not required. Check pt_type and set Synthetic Autocorrelator parms for best result. [ ] Add constant station delay to station clock model file HARTRAO_c.smb. This must always be >= 0.0. [ ] Add CALIBRATION and ANTENNA coefficients to HARTRAO.cal -- if required. [ ] Check NOTO.st for correct parameters...modify if necessary. NOTO.ev files contain events for ALL channels...modification required if pulsar gating is used. Comment .ev file reference if not required. Check pt_type and set Synthetic Autocorrelator parms for best result. [ ] Add GPS clock offset model to station clock model file NOTO_c.smb. If station time is faster/leading GPS time then it is a (+)'ve delay. [ ] Add constant station delay to station clock model file NOTO_c.smb. This must always be >= 0.0. [ ] Add CALIBRATION and ANTENNA coefficients to NOTO.cal -- if required. [ ] Check VS06z.bs for correct baselines...remove comments if baseline module autocorrelation is required. Check baseline integration times. [ ] Ensure that SOURCE 'J0149+05' is in ~/smdb/finblokq.dat or in finlocq.dat Ensure source coordinates are IDENTICAL to that in the VS06z.sum file. [ ] Ensure that SOURCE '2251+158' is in ~/smdb/finblokq.dat or in finlocq.dat Ensure source coordinates are IDENTICAL to that in the VS06z.sum file. [ ] Ensure that SOURCE '0119+115' is in ~/smdb/finblokq.dat or in finlocq.dat Ensure source coordinates are IDENTICAL to that in the VS06z.sum file. [ ] Update file J0149+05.cal -- if necessary for cc2fits (source coordinates are automatically extracted from the VS06z.eg file). [ ] Update file 2251+158.cal -- if necessary for cc2fits (source coordinates are automatically extracted from the VS06z.eg file). [ ] Update file 0119+115.cal -- if necessary for cc2fits (source coordinates are automatically extracted from the VS06z.eg file). [ ] Check to ensure that ~/smdb/finals.data is up-to-date for this obs. [ ] When all above checks are complete run 'makeVS06z'. [ ] Check 'models.out' for any model generation ERRORs or WARNINGs [ ] 'makeVS06z' ran ok? [ ] Run 'cc2fits' until BSD file catalogging starts -- to ensure job is FITS exportable. [ ] Create job VS06z directory on geo (e.g. geod1/VS06z), copy 'cc2fits.control' and edit it in preparation for FITS export and raw data archive. [ ] Job 'VS06z' is ready for correlation. --------------------- JOB 'VS06z' PLAYBACK SCHEDULE ------------------ ARE NRA HAR NOT 319-21:00+00 - - - - +05 - - - - +10 - - - - +15 - - - - +20 - - - - +25 - - - - +30 - - - - +35 - - - - +40 - - - - +45 - - - - +50 - - - - +55 - T** T** T** 319-22:00+00 - P P P +05 - P P P +10 - P P P +15 - P P P +20 - P P P +25 - P P P +30 - P P P +35 - P P P +40 - P P P +45 - P P P +50 - P P P +55 - P P P 319-23:00+00 - P P P +05 - P P P +10 - P P P +15 - P P P +20 - P P P +25 - P P P +30 - P P P +35 - P P P +40 - P P P +45 - P P P +50 - P P P +55 - P P P 320-00:00+00 - P P P +05 - P P P +10 - P P P +15 - P P P +20 - P P P +25 - P P P +30 - P P P +35 - P P P +40 - P P P +45 - P P P +50 - P P P +55 - P P P 320-01:00+00 - P P P +05 - P P P +10 - P P P --------------------- JOB 'VS06z' PLAYBACK SCHEDULE ------------------ ARE NRA HAR NOT +15 - P P P +20 - P P P +25 - P P P +30 - P P P +35 T** P - P +40 P P - P +45 P P - P +50 P P - P +55 P P - P 320-02:00+00 P - - - +05 - - - - +10 - - - - +15 - - - - +20 - - - - ================== EXPERIMENT 'VS06z' SUMMARY REPORT ================== **** TO BE FILLED IN BY THE PR AND GIVEN TO THE OPERATIONS MANAGER **** DATE: _________________ PR: ____________ [ ] RELEASED [ ] ABANDONED Reason: ================================ STATION FRINGE DETECTION SUMMARY ================================ ARECIBO fringes detected _______% of the time. Comments: NRAO_140 fringes detected _______% of the time. Comments: HARTRAO fringes detected _______% of the time. Comments: NOTO fringes detected _______% of the time. Comments: ==================== DATA RELEASE SUMMARY ==================== Release date: _____________________________ Data volume: ________ FITS files; _______ Gbytes Exabyte/DAT Shipments (TO/FORMAT/CARRIER): Comments: