cje2c3l Version 1.22d Thu Oct 7 15:07:37 PDT 1999 ============================== cje2c3l W030f2 Build Summary ============================== Job Start Epoch: 2000-183-11:00:00 Job Stop Epoch: 2000-183-21:06:54 Duration of job: 10.1 hours Tape change epochs: 1 Stations: 'CEDUNA' (grt) 'HARTRAO' (grt) 'HOBART' (grt) 'VSOP_SC' (srt) Tracking Stations: 'MADRD_TS' Tracking PASSES: 'MADRD_TS' 2000-183-15:58:40 --> 2000-183-20:51:54 Sources: 'J1911-20' '1730-130' Tape ids: 'AT-3-0050017' 'AT-3-005031A' 'CA-3-0080009' 'AT-3-0029926' 'AT-3-0004218' 'CA-3-0019611' Totals: [12] PB_STARTs [12] PB_STOPS [6] Tape ids [3] PCFS logs [1] SRT logs This job was built by ________________ on Mon Aug 14 13:29:32 2000 Number of baselines at build time: 6 ACTUAL: ____________ Total number of lags at build time: 6144 ACTUAL: ____________ Duration of job at build time: 10.1 HRS ACTUAL: _____________ Checked and ready for correlation. Date: _________________ Person: ________________ =========================== CHECKLIST for job 'W030f2' =========================== Complete this checklist before running 'makeW030f2'. [ ] Copy the experiment W030f2.sum file and any additional note files to the job's working directory. If ATNF telescopes are involved, note files in the form of .notes must be downloaded from the ATNF server 'ftp.atnf.csiro.au' in the directory '/pub/people/vlbi/vsop/logs/'. These note files contain information ***CRITICAL*** to the correlation of ATNF telescopes. [ ] Check W030f2.jb for correct parameters (sample rate etc.) Check default integration time. [ ] Ensure that TCF file(s) (*.kcX) for tracking station 'MADRD_TS' are in the job directory for time ranges (yymmddhhmm): 10007011558 to 10007012051. X - d==Goldstone; m==Madrid; t==Tidbinbilla; g==Greenbank; u==Usuda [ ] Add reconstr-orbit binary spk file(s) (.bsp) to W030f2.egb -- look for ??? Ensure these .bsp files are in the job directory and cover required tracking pass time ranges. [ ] Check CEDUNA.st for correct parameters...modify if necessary. CEDUNA.ev files contain events for ALL channels...modification required if pulsar gating is used. Comment .ev file reference if not required. Check pt_type and set Synthetic Autocorrelator parms for best result. [ ] Add GPS clock offset model to station clock model file CEDUNA_c.smb. If station time is faster/leading GPS time then it is a (+)'ve delay. [ ] Add constant station delay to station clock model file CEDUNA_c.smb. This must always be >= 0.0. [ ] Add CALIBRATION and ANTENNA coefficients to CEDUNA.cal -- if required. [ ] Check HARTRAO.st for correct parameters...modify if necessary. HARTRAO.ev files contain events for ALL channels...modification required if pulsar gating is used. Comment .ev file reference if not required. Check pt_type and set Synthetic Autocorrelator parms for best result. [ ] Add constant station delay to station clock model file HARTRAO_c.smb. This must always be >= 0.0. [ ] Add CALIBRATION and ANTENNA coefficients to HARTRAO.cal -- if required. [ ] Check HOBART.st for correct parameters...modify if necessary. HOBART.ev files contain events for ALL channels...modification required if pulsar gating is used. Comment .ev file reference if not required. Check pt_type and set Synthetic Autocorrelator parms for best result. [ ] Add constant station delay to station clock model file HOBART_c.smb. This must always be >= 0.0. [ ] Add CALIBRATION and ANTENNA coefficients to HOBART.cal -- if required. [ ] Check VSOP_SC.st for correct parameters...modify if necessary. VSOP_SC.ev files contain events for ALL channels...modification required if pulsar gating is used. Check pt_type and set Synthetic Autocorrelator parms for best result. [ ] NOTE: If VSOP_SC logs do not contain flag data, these must be extracted from 'models.out' after make'ing the job and put in the VSOP_SC.ev file in the proper format. Look for 'linear connection'. [ ] Add TCF FITS file references (*.kcX) to VSOP_SC_l.smb -- look for ?? X - d==Goldstone; m==Madrid; t==Tidbinbilla; g==Greenbank; u==Usuda IF TCF FILES ARE NOT AVAILABLE then the downlink delay must be added. [ ] Add CALIBRATION and ANTENNA coefficients to VSOP_SC.cal -- if required. [ ] Check W030f2.bs for correct baselines...remove comments if baseline module autocorrelation is required. Check baseline integration times. [ ] Ensure that SOURCE 'J1911-20' is in ~/smdb/finblokq.dat or in finlocq.dat Ensure source coordinates are IDENTICAL to that in the W030f2.sum file. [ ] Ensure that SOURCE '1730-130' is in ~/smdb/finblokq.dat or in finlocq.dat Ensure source coordinates are IDENTICAL to that in the W030f2.sum file. [ ] Update file J1911-20.cal -- if necessary for cc2fits (source coordinates are automatically extracted from the W030f2.eg file). [ ] Update file 1730-130.cal -- if necessary for cc2fits (source coordinates are automatically extracted from the W030f2.eg file). [ ] Check to ensure that ~/smdb/finals.data is up-to-date for this obs. [ ] When all above checks are complete and all auxillary TCF and bsp files are installed, run 'makeW030f2'. [ ] Check 'models.out' for any model generation ERRORs or WARNINGs [ ] 'makeW030f2' ran ok? [ ] Run 'cc2fits' until BSD file catalogging starts -- to ensure job is FITS exportable. [ ] Create job W030f2 directory on geo (e.g. geod1/W030f2), copy 'cc2fits.control' and edit it in preparation for FITS export and raw data archive. [ ] Job 'W030f2' is ready for correlation. ================== EXPERIMENT 'W030f2' SUMMARY REPORT ================== **** TO BE FILLED IN BY THE PR AND GIVEN TO THE OPERATIONS MANAGER **** DATE: _________________ PR: ____________ ================================ STATION FRINGE DETECTION SUMMARY ================================ CEDUNA: [ ] fringes detected Comments: Delay corr: _________ us Delay resid: _________ us Rate resid: _________ ps/s HARTRAO: [ ] fringes detected Comments: Delay corr: _________ us Delay resid: _________ us Rate resid: _________ ps/s HOBART: [ ] fringes detected Comments: Delay corr: _________ us Delay resid: _________ us Rate resid: _________ ps/s VSOP_SC: [ ] fringes detected Comments: Delay corr: _________ us Delay resid: _________ us Rate resid: _________ ps/s ==================================== TRACKING STATION PERFORMANCE SUMMARY ==================================== 'MADRD_TS' 2000-183-15:58:40 --> 2000-183-20:51:54 % fringes: _______ ~Res. del: _______ ~Res. drate: _______ ==================== DATA RELEASE SUMMARY ==================== [ ] RELEASED [ ] ABANDONED Reason: Release date: _____________________________ Data volume: ________ FITS files; _______ Gbytes Data Shipments: [ ] PI: ____________________ DAT / Exabyte [ ] U of C: Exabyte [ ] Other: _________________ DAT / Exabyte Comments: