cje2c3l Version 1.22c Jun. 25 1998 10:49 PDT ============================== cje2c3l W049a1 Build Summary ============================== Job Start Epoch: 1999-218-22:00:00 Job Stop Epoch: 1999-219-13:15:06 Duration of job: 15.3 hours Tape change epochs: 2 Stations: 'VSOP_SC' (srt) 'HARTRAO' (grt) 'HOBART' (grt) 'MK' (grt) 'MOP' (grt) Tracking Stations: 'GOLDS_TS' 'GBANK_TS' 'MADRD_TS' 'USUDA_TS' Tracking PASSES: 'GOLDS_TS' 1999-218-22:37:12 --> 1999-219-02:42:11 'GBANK_TS' 1999-219-10:09:07 --> 1999-219-10:13:05 'MADRD_TS' 1999-219-03:49:52 --> 1999-219-07:10:19 'USUDA_TS' 1999-219-07:10:01 --> 1999-218-06:00:00 Sources: 'J1305-49' '1213-172' '1334-127' Tape ids: 'CA-3-0056410' 'CA-3-0042007' 'UT-3-001122A' 'AT-3-002061A' 'CA-3-002290E' 'CA-3-0015108' 'ZA-3-000201A' 'ATNF0094' 'CA-3-0046813' 'CA-3-001710A' 'CA-3-0079112' Totals: [49] PB_STARTs [49] PB_STOPS [11] Tape ids [3] PCFS logs [1] SRT logs This job was built by ________________ on Thu Sep 16 13:53:15 1999 Number of baselines at build time: 10 ACTUAL: ____________ Total number of lags at build time: 5120 ACTUAL: ____________ Duration of job at build time: 15.3 HRS ACTUAL: _____________ Checked and ready for correlation. Date: _________________ Person: ________________ =========================== CHECKLIST for job 'W049a1' =========================== Complete this checklist before running 'makeW049a1'. [ ] Copy the experiment W049a1.sum file and any additional note files to the job's working directory. If ATNF telescopes are involved, note files in the form of .notes must be downloaded from the ATNF server 'ftp.atnf.csiro.au' in the directory '/pub/people/vlbi/vsop/logs/'. These note files contain information ***CRITICAL*** to the correlation of ATNF telescopes. [ ] Check W049a1.jb for correct parameters (sample rate etc.) Check default integration time. [ ] Ensure that TCF file(s) (*.kcX) for tracking station 'GOLDS_TS' are in the job directory for time ranges (yymmddhhmm): 9908062237 to 9908070242. X - d==Goldstone; m==Madrid; t==Tidbinbilla; g==Greenbank; u==Usuda [ ] Ensure that TCF file(s) (*.kcX) for tracking station 'GBANK_TS' are in the job directory for time ranges (yymmddhhmm): 9908071009 to 9908071013. X - d==Goldstone; m==Madrid; t==Tidbinbilla; g==Greenbank; u==Usuda [ ] Ensure that TCF file(s) (*.kcX) for tracking station 'MADRD_TS' are in the job directory for time ranges (yymmddhhmm): 9908070349 to 9908070710. X - d==Goldstone; m==Madrid; t==Tidbinbilla; g==Greenbank; u==Usuda [ ] Ensure that TCF file(s) (*.kcX) for tracking station 'USUDA_TS' are in the job directory for time ranges (yymmddhhmm): 9908070710 to 9908060600. X - d==Goldstone; m==Madrid; t==Tidbinbilla; g==Greenbank; u==Usuda [ ] Add reconstr-orbit binary spk file(s) (.bsp) to W049a1.egb -- look for ??? Ensure these .bsp files are in the job directory and cover required tracking pass time ranges. [ ] Check VSOP_SC.st for correct parameters...modify if necessary. VSOP_SC.ev files contain events for ALL channels...modification required if pulsar gating is used. Check pt_type and set Synthetic Autocorrelator parms for best result. [ ] NOTE: If VSOP_SC logs do not contain flag data, these must be extracted from 'models.out' after make'ing the job and put in the VSOP_SC.ev file in the proper format. Look for 'linear connection'. [ ] Add TCF FITS file references (*.kcX) to VSOP_SC_l.smb -- look for ?? X - d==Goldstone; m==Madrid; t==Tidbinbilla; g==Greenbank; u==Usuda IF TCF FILES ARE NOT AVAILABLE then the downlink delay must be added. [ ] Add CALIBRATION and ANTENNA coefficients to VSOP_SC.cal -- if required. [ ] Check HARTRAO.st for correct parameters...modify if necessary. HARTRAO.ev files contain events for ALL channels...modification required if pulsar gating is used. Comment .ev file reference if not required. Check pt_type and set Synthetic Autocorrelator parms for best result. [ ] Add constant station delay to station clock model file HARTRAO_c.smb. This must always be >= 0.0. [ ] Add CALIBRATION and ANTENNA coefficients to HARTRAO.cal -- if required. [ ] Check HOBART.st for correct parameters...modify if necessary. HOBART.ev files contain events for ALL channels...modification required if pulsar gating is used. Comment .ev file reference if not required. Check pt_type and set Synthetic Autocorrelator parms for best result. [ ] Add constant station delay to station clock model file HOBART_c.smb. This must always be >= 0.0. [ ] Add CALIBRATION and ANTENNA coefficients to HOBART.cal -- if required. [ ] Check MK.st for correct parameters...modify if necessary. MK.ev files contain events for ALL channels...modification required if pulsar gating is used. Comment .ev file reference if not required. Check pt_type and set Synthetic Autocorrelator parms for best result. [ ] Add GPS clock offset model to station clock model file MK_c.smb. If station time is faster/leading GPS time then it is a (+)'ve delay. [ ] Add constant station delay to station clock model file MK_c.smb. This must always be >= 0.0. [ ] Add CALIBRATION and ANTENNA coefficients to MK.cal -- if required. [ ] Check MOP.st for correct parameters...modify if necessary. MOP.ev files contain events for ALL channels...modification required if pulsar gating is used. Comment .ev file reference if not required. Check pt_type and set Synthetic Autocorrelator parms for best result. [ ] Add GPS clock offset model to station clock model file MOP_c.smb. If station time is faster/leading GPS time then it is a (+)'ve delay. [ ] Add constant station delay to station clock model file MOP_c.smb. This must always be >= 0.0. [ ] Add CALIBRATION and ANTENNA coefficients to MOP.cal -- if required. [ ] Check W049a1.bs for correct baselines...remove comments if baseline module autocorrelation is required. Check baseline integration times. [ ] Ensure that SOURCE 'J1305-49' is in ~/smdb/finblokq.dat or in finlocq.dat Ensure source coordinates are IDENTICAL to that in the W049a1.sum file. [ ] Ensure that SOURCE '1213-172' is in ~/smdb/finblokq.dat or in finlocq.dat Ensure source coordinates are IDENTICAL to that in the W049a1.sum file. [ ] Ensure that SOURCE '1334-127' is in ~/smdb/finblokq.dat or in finlocq.dat Ensure source coordinates are IDENTICAL to that in the W049a1.sum file. [ ] Update file J1305-49.cal -- if necessary for cc2fits (source coordinates are automatically extracted from the W049a1.eg file). [ ] Update file 1213-172.cal -- if necessary for cc2fits (source coordinates are automatically extracted from the W049a1.eg file). [ ] Update file 1334-127.cal -- if necessary for cc2fits (source coordinates are automatically extracted from the W049a1.eg file). [ ] Check to ensure that ~/smdb/finals.data is up-to-date for this obs. [ ] When all above checks are complete and all auxillary TCF and bsp files are installed, run 'makeW049a1'. [ ] Check 'models.out' for any model generation ERRORs or WARNINGs [ ] 'makeW049a1' ran ok? [ ] Run 'cc2fits' until BSD file catalogging starts -- to ensure job is FITS exportable. [ ] Create job W049a1 directory on geo (e.g. geod1/W049a1), copy 'cc2fits.control' and edit it in preparation for FITS export and raw data archive. [ ] Job 'W049a1' is ready for correlation. --------------------- JOB 'W049a1' PLAYBACK SCHEDULE ------------------ VSO HAR HOB MK MOP 218-22:00+00 - - - - - +05 - - - - - +10 - - - - - +15 - - - - - +20 - - - - - +25 - - - - - +30 - - - - - +35 - - - - - +40 T** - - - - +45 P - - - - +50 P - - - - +55 P - - - - 218-23:00+00 P - - - - +05 P - - - - +10 P - - - - +15 P - - - - +20 P - - - - +25 P - - - - +30 P - - - - +35 P - - - - +40 P - - - - +45 P - - - - +50 P - - - - +55 P - T** - T** 219-00:00+00 P - P T** P +05 P - P T** P +10 P - P P P +15 P - P P P +20 P - P - P +25 P - P P P +30 P - P P P +35 P - P P P +40 P - P - P +45 P - P P P +50 P - P P P +55 P - P - P 219-01:00+00 P - P P P +05 P - P - P +10 P - P P P +15 P - P P P +20 P - P P P +25 P - P - P +30 P - P P P +35 P - P P P +40 P - P - P +45 P - P - P +50 P - P P P +55 P - P - P 219-02:00+00 P - P P P +05 P - P P P +10 P - P - P --------------------- JOB 'W049a1' PLAYBACK SCHEDULE ------------------ VSO HAR HOB MK MOP +15 P - P P P +20 P - P - P +25 P - P P P +30 P - P - P +35 P - P P P +40 - - P P P +45 - - P - P +50 - - P - P +55 - - P - P 219-03:00+00 - - - - - +05 - - - - - +10 - - - - - +15 - - - - - +20 - - - - - +25 - - - - - +30 - - - - - +35 - - P - P +40 - - P P P +45 - - P - P +50 - - P - P +55 T** - P - P 219-04:00+00 P - P - P +05 P - P P P +10 P - P P P +15 P - P P P +20 P - P - P +25 P - P P P +30 P - P P P +35 P - P - P +40 P - P - P +45 P - P P P +50 P - P P P +55 P - P - P 219-05:00+00 P - P - P +05 P - P - P +10 P - P - P +15 P - P - P +20 P - P - P +25 P - P - P +30 P - P P P +35 P - P P P +40 P - P P P +45 P - P - P +50 P - P P P +55 P - P - P 219-06:00+00 P - P P P +05 P - P - P +10 P - P - P +15 P - P T** P +20 P - T** - T** +25 P - T** P T** --------------------- JOB 'W049a1' PLAYBACK SCHEDULE ------------------ VSO HAR HOB MK MOP +30 P - P - P +35 P - P - P +40 P - P - P +45 P - P - P +50 P - P - P +55 P - P - P 219-07:00+00 P - P - P +05 P - P - P +10 - - P - P +15 T** - P - P +20 P - P - P +25 P - P - P +30 P - P - P +35 P - P - P +40 P - P - P +45 P - P - P +50 P - P - P +55 P - P - P 219-08:00+00 P - P - P +05 P - P - P +10 P - P - P +15 P - P - P +20 P - P - P +25 P T** P - P +30 P P P - P +35 P P P - P +40 P P P - P +45 P P P - P +50 P P P - P +55 P P P - P 219-09:00+00 - P P - P +05 - P P - P +10 - - - - - +15 - - - - - +20 - - - - - +25 - - - - - +30 - - - - - +35 - - - - - +40 - - - - - +45 - - - - - +50 - - - - - +55 - P P - - 219-10:00+00 - P P - - +05 - P P - - +10 - P P - - +15 - P P - - +20 - P P - - +25 - P P - - +30 - P P - - +35 - P P - - +40 - P P - - --------------------- JOB 'W049a1' PLAYBACK SCHEDULE ------------------ VSO HAR HOB MK MOP +45 - P P - - +50 - P P - - +55 - P P - - 219-11:00+00 - P P - - +05 - P P - - +10 - P P - - +15 - P P - - +20 - P P - - +25 - P P - - +30 - P P - - +35 - P P - - +40 - P P - - +45 - P P - - +50 - P P - - +55 - P P - - 219-12:00+00 - P P - - +05 - P P - - +10 - P P - - +15 - P P - - +20 - P P - - +25 - P P - - +30 - P P - - +35 - P P - - +40 - P P - - +45 - P P - - +50 - P P - - +55 - P P - - 219-13:00+00 - - - - - +05 - - - - - +10 - - - - - +15 - - - - - ================== EXPERIMENT 'W049a1' SUMMARY REPORT ================== **** TO BE FILLED IN BY THE PR AND GIVEN TO THE OPERATIONS MANAGER **** DATE: _________________ PR: ____________ [ ] RELEASED [ ] ABANDONED Reason: ================================ STATION FRINGE DETECTION SUMMARY ================================ VSOP_SC fringes detected _______% of the time. Comments: HARTRAO fringes detected _______% of the time. Comments: HOBART fringes detected _______% of the time. Comments: MK fringes detected _______% of the time. Comments: MOP fringes detected _______% of the time. Comments: ==================================== TRACKING STATION PERFORMANCE SUMMARY ==================================== 'GOLDS_TS' 1999-218-22:37:12 --> 1999-219-02:42:11 % fringes: _______ ~Res. del: _______ ~Res. drate: _______ 'GBANK_TS' 1999-219-10:09:07 --> 1999-219-10:13:05 % fringes: _______ ~Res. del: _______ ~Res. drate: _______ 'MADRD_TS' 1999-219-03:49:52 --> 1999-219-07:10:19 % fringes: _______ ~Res. del: _______ ~Res. drate: _______ 'USUDA_TS' 1999-219-07:10:01 --> 1999-218-06:00:00 % fringes: _______ ~Res. del: _______ ~Res. drate: _______ ==================== DATA RELEASE SUMMARY ==================== Release date: _____________________________ Data volume: ________ FITS files; _______ Gbytes Exabyte/DAT Shipments (TO/FORMAT/CARRIER): Comments: